Vaisala PTU300 Guide de l'utilisateur Page 49

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 173
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 48
Chapter 3 _______________________________________________________________ Installation
VAISALA _______________________________________________________________________ 47
8. Connect the power.
9. Select the quantity and scale the channel via the serial line or
display/keypad, see section Analog Output Quantities on page
96. For testing the analog output, see section Analog Output
Tests on page 98. For fault indication setting, see section Analog
Output Fault Indication Setting on page 99.
Relays
PTU300 can be equipped with one or two configurable relay modules.
Each module contains two configurable relays. See the contact ratings
in section Technical Specifications of Optional Modules on page 148.
Installation and Wiring
1. Disconnect the power and open the transmitter cover. In case the
relay-module is installed in the factory, continue with step 5.
2. To attach the module fasten the relay module to the bottom of
the housing with four screws. See the position in Figure 2 on
page 17.
3. When the mains power is in use attach the grounding wire to the
grounding terminal.
4. Connect the flat cable between the relay module and the
MODULE 1 pins of the motherboard.
5. Take out the protective plug from the cable gland and thread the
relay wires.
6. Connect the wires to the screw terminals: NO, C, NC.
Vue de la page 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 172 173

Commentaires sur ces manuels

Pas de commentaire