
BGC-FTIR Sensors | Precipitation 15152 19
Mounting
The Sensor can be fixed at the mast on the top of the BGC-FTIR-Container.
When selecting the installation place please pay attention that the sensing
surface points in direction to the sky. Also check that the installation site is
free of obstacles to the close surrounding. Maintaine a distance of 10 times
the hight of the obstacles to assure that the installation corresponds to the
definition of an undisturbed terrain.
Connection
The connection cable is led along the mast and has to be fastened using ap-
propriate cable ties.
Figure 1.13: Connection Diagram
The electrical connection is carried out according to Fig. 1.13. For more de-
tails see section 1.4.1 on page 42.
NOTE: After connecting the sensor to the power supply the relay will stay
in the precipitation = yes state for about 5.5 minutes. After that,
the sensor will resume normal operation.
Commentaires sur ces manuels